Nick's Contracting Master Estimator

Enter the work area, include the trades needed, and select Level 1, 2, or 3 for each trade.

```
Project area
452 sq ft
Selected work
0 trades
Working estimate
$2,500

Current setup: 32′ × 11′ plus 100 additional sq ft.

Work levels

Level 1 = open access and ordinary scope. Level 2 = moderate obstacles or added labor. Level 3 = difficult access, heavy material, complex conditions, or substantial protection.

Use Trade Level Rate Total
Level 1

Clear access, light material, ordinary construction, short carry, and minimal protection.

Level 2

Occupied home, mixed materials, stairs, moderate cutting, added protection, or selective work.

Level 3

Tight access, long carry, heavy debris, multiple layers, structural complexity, or suspected hazardous conditions.

Trade subtotal
$0
General conditions
$0
Allowances
$2,500
Estimated contract
$2,500

Hazardous-material rule: Level 3 reflects difficult or suspicious conditions but does not include licensed asbestos, lead, mold, or other regulated abatement. Testing and abatement remain separate. This calculator produces a planning estimate, not a binding contract.

```

Your project scope has been generated.

Next we’ll review measurements, materials, pricing, timeline, and final project details together.